Project GHGTC-23A is an upgrade of Project GHGTC-2 from three electrolyzers to fourteen (14) electrolyzers and is designed to work as an on-grid clean flexible power plant. (Project GHGTC-2 is off-grid.) Also, I replaced the vertical axis wind turbines, FX 30kW, with FX 200000W and the power plant has (78) FX 200000W vertical axis wind turbines and I kept those three horizontal axis wind turbines (500kW each one).
I kept the hydrogen storage exactly how it is in Project GHGTC-2 and I eliminated those three RVs on the south side of the hydrogen production facility.
Please find attached three pictures of the Aerial View of the Power Plant. I would like to have this project executed in 3D electronic support.
Healthcare & Nutrition Blog Writing - 20/02/2026 00:48 EST Category: Article Writing, Blog Writing, Content Writing, Diet, Ghostwriting, Health Care Management, Life Coaching, Nutrition, SEO Writing, Video Editing Budget: ₹600 - ₹1500 INR
24-Feb-2026 05:04 GMT
Nature Documentary Video Editor Category: Adobe Premiere Pro, After Effects, Content Creation, Data Visualization, Film Production, Post Production, Video Editing, Video Production, Video Services Budget: ₹1500 - ₹12500 INR
24-Feb-2026 05:04 GMT
Elegant Wedding Animation - 22/02/2026 22:42 EST Category: 2D Animation, 3D Animation, Adobe Animate, Adobe Creative Cloud, After Effects, Animation, Graphic Design, Video Production Budget: min ₹2500 INR
AI Product Showcase Video for Instagram Category: 3D Animation, Adobe Premiere Pro, After Effects, AI Animation, AI Art Creation, Animation, Video Editing, Video Services Budget: ₹12500 - ₹37500 INR
24-Feb-2026 04:56 GMT
Professional Sales Landing Page Design Category: Brochure Design, Content Writing, Facebook Marketing, Graphic Design, Sales, Web Design, Web Development Budget: ₹600 - ₹1500 INR
24-Feb-2026 04:53 GMT
WooCommerce E-commerce Store Design Category: ECommerce, Shopping Cart Integration, UI / User Interface, Web Design, Web Development, WooCommerce, WordPress Budget: ₹750 - ₹1250 INR