An update of a previously obtained Barrister's Opinion is required. The previous Opinion which is in the attachments was provided in respect of the council discharging a planning condition for the drainage of the new development which clearly showed a service route to be taken from the site within the approval site boundary and across a neighbouring site which was rented to the main contractor with the consent of the owners of the neighbouring site. Several trees were in the path of the service route and these were protected under a TPO. The attached Opinion considers that the discharged planning condition trumps the TPO. The trees were subsequently felled on the strength of that Opinion. The council are now prosecuting the land owner for allowing the trees to be felled without consent. During the deliberations of this matter is has become apparent that the council also discharged a separate planning condition which was the Construction Management Plan (CMP). This included a substantial part regarding the same neighbouring site that the service run was taken across which was to be used as a "builder's yard" during the course of the construction of the approved housing development. It is clear that the neighbouring site could not be used used without some of the trees on the site being either felled due to them being physically in the way or damaged by traffic movement and storage of materials and containers within Root Protection Zones. There is no mention of the possible damage to the trees in the CMP and the council did not ask for protection measures. It is the belief of the land owner that the discharge of the CMP has a similar effect on the TPO as the discharge of the drainage condition. The new Opinion should review and confirm the original Opinion and then add confirmation that the discharge of the CMP also trumps the TPO. The attached documents are the Original Opinion, the CMP and the Drainage Drawing. Comprehensive further documentation will be provided to interested parties.
Hiring AI Expert Category: AI Agents, AI Chatbot Development, AI Consulting, AI Development, AI Model Development, AI Research, AI Text To Speech, AI Text To Text, Generative AI, Machine Learning (ML) Budget: $750 - $1500 USD
16-Mar-2026 11:01 GMT
किसी भी भाषा को अनुवाद ले Category: Content Development, Content Writing, Copywriting, Creative Writing, Editing, English Translation, Research Writing, Script Writing, Translation Budget: ₹750 - ₹1250 INR
16-Mar-2026 10:59 GMT
Instructional Video Editing Needed -- 2 Category: A / V Editing, Adobe Premiere Pro, After Effects, Audio Editing, Motion Graphics, Video Editing, Video Production, Video Services Budget: $30 - $250 USD
Architectural STL Model Creation -- 2 Category: 3D Animation, 3D CAD, 3D Design, 3D Graphic Design, 3D Modelling, 3D Printing, 3D Rendering, 3D Visualization, 3ds Max, AutoCAD Budget: £20 - £250 GBP
16-Mar-2026 10:54 GMT
50-Year Family Home Documentary Category: Audio Editing, Music Production, Video Editing, Video Post Editing, Video Processing, Video Production, Videography Budget: $2 - $1000 USD
Modern Home Interior Revamp Category: 3D Modelling, 3D Rendering, Building Architecture, Design Optimization, Interior Design, Lighting Design, SketchUp, Visual Design Budget: ₹12500 - ₹37500 INR