Expected duration: 1 day or less I need a boq and cost estimate for a structural project, just the concrete foundation broken down In an excel sheet and also like the form attached
1. Excavation of footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 2. Excavation of exterior and interior grade beams – Ref. S100 details 1,2,3,4,5,6,7 & 8/S300 3. Installation of vapor barriers for footings, grade beams and slab on grade concrete 4. Footing F1 (5-qty x 2), F2 (1-qty x 2) and Elevator shaft recess footing (1- qty x 2) – Ref. S100 5. Exterior and interior grade beams – Ref. foundation size schedule for conventional grade beams and footings on S100 and details 1,2,3,4,5,6,7 & 8/S300 6. Structural Steel anchor bolts/ embed plate per 9/S300, baseplate per 10/S300 and A211 – Floor Plan Building B&C 7. Slab of grade reinforcement with #3@12” O.C. 8. Pour 4,000psi concrete footings, beams and slab on grade.
ComfyUI Setup for AI Generated Roblox-Style Video Category: After Effects, AI (Artificial Intelligence) HW / SW, AI Development, AI Model Development, ComfyUI, Video Editing, Video Services Budget: $30 - $250 USD
Drone 3D Visualization Package Category: 3D Animation, 3D Modelling, 3D Rendering, 3D Visualization, 3ds Max, AR / VR 3D Asset, Blender, Cinema 4D, Maya, Visual Effects Budget: $800 - $1200 CAD
25-Nov-2025 22:50 GMT
Engaging Website for Social Boost -- 2 Category: Frontend Development, Internet Marketing, Next.js, PHP, SEO, UI / User Interface, Web Development, Web Design, WordPress Budget: $15 - $25 USD
25-Nov-2025 22:50 GMT
Secure National Media Coverage Category: Article Writing, Brand Management, Content Marketing, Content Writing, Creative Writing, Ghostwriting, Journalism, Public Relations Budget: $250 - $750 AUD